SEWER CAP & SEAL PACKAGE
DON’T GET CAUGHT OUT!
Reasons to Cap and Seal:
1/ It is illegal not to (Water Authority & VBA)
2/ Avoid damage to existing sewer.
3/ Avoid dirt & rubbish entering and blocking the sewer.
Package Includes
- Excavation of Water Boards sewer point
- Cap and seal of sewer point
- Back fill of excavation
- Marker for future reference
- Photo of works
- Camera Boards Point for damage/obstruction (tree roots etc) drain and report (recommended) - optional extra.
Eastern, South Eastern, Yarra Valley, Mornington Areas Melbourne
Most construction requires Bored Piers. If the existing sewer line is drilled through this can result in concrete back flow to the sewer main if not cap and sealed. This can cost tens of thousands of dollars to repair adding unnecessary costs and time delays to your building project.
Who is responsible? The owner, builder, concreter or demolition company???